What You’ll Learn
- Who must be involved in a lockout — and why it is wider than the electrician doing the work
- Why a lockout procedure must be built from up-to-date drawings, not memory
- What “control all energy” really means, including stored and mechanical energy
- How an interlock or a backfeed can silently re-energize a circuit you thought was dead
- Why a push-button or selector switch can never be your isolating device
- How lockout devices must be identified, and how lockout must be coordinated across employers and energy types
Seven Rules Before a Single Lock Goes On
Lockout/tagout is not a single action. It is a procedure — and like any procedure, it only protects people when it is built on the right principles. Section 120.3 of NFPA 70E sets out seven of them. They answer the questions that decide whether a lockout actually works: who is part of it, what information it is based on, which energy it controls, what could defeat it, where the lock goes, how the lock is recognized, and how it fits with everyone else’s procedures.
None of these principles is optional, and none of them is a substitute for the others. A perfectly applied lock on the wrong disconnect, a procedure written from an out-of-date drawing, or a lockout that nobody told the neighbouring crew about can each defeat an otherwise careful job. Read together, the seven principles are the test a lockout plan has to pass before anyone touches a conductor.
1. Employee Involvement — Everyone Who Could Be Exposed
Employee involvement means that every person who could be exposed to a source of electrical energy — directly or indirectly — must be part of the lockout/tagout procedure. Direct exposure is the obvious case: the qualified electrician working on the motor starter, the power circuits, or the motor itself. Indirect exposure is the case people miss: the person working on the coupling between the motor and the compressor, whose hands are on equipment that moves when the motor starts, even though they never touch a wire.
That net is deliberately wide. It includes temporary and contract employees, whose work may bring them into contact with the hazard even when their assigned task is not electrical. And it includes the people who are simply nearby: other affected employees must be told when a lockout is put in place, and told why. A lockout that only the electrician knows about is a lockout that a well-meaning colleague can undo, bypass, or work around without ever knowing the danger.
2. The Procedure — Built on Drawings, Not Memory
A lockout/tagout procedure must be developed from the electrical equipment and system as it actually exists, using suitable documentation — above all, up-to-date drawings and diagrams — and it must meet the requirements of the applicable codes, standards, and regulations for locking and tagging electrical sources.
The drawing matters because it is the map of every source of energy that is, or might be, available at any point in the circuit. If the single-line diagram is out of date — a feeder added, a tie breaker installed, a circuit re-routed — a source can be left connected simply because nobody knew it was there. That is why the procedure is built per equipment and per system, not copied from a generic template, and why keeping the drawings current is itself a safety duty. A procedure written from memory, or from a diagram that no longer matches the installation, is a guess dressed up as a plan.
3. Control of Energy — Every Source, Not Just the Obvious One
Control of energy requires that all sources of electrical energy be controlled in a way that minimizes employee exposure to electrical hazards. “All sources” is the operative phrase. It covers the normal supply, any alternate or standby supply, and stored energy — the charge held in capacitors, for example — as well as mechanical energy that can move parts or release stored force.
In practice, that means operating every applicable disconnecting means to remove the energy, not just the one that feeds the equipment from the front. Once those disconnects are open, everyone who may be exposed should be involved in the lockout procedure — which brings the first principle back into play. Controlling only the supply you can see, while a second source waits behind a transfer switch or inside a capacitor bank, is not control at all.
4. Electrical Circuit Interlocks — The Hidden Way Back In
Electrical circuit interlocks must be checked before work begins: the documentation, including up-to-date drawings and diagrams, must be reviewed to make sure no interlock operation can re-energize the circuit being worked on.
An interlock is a device or circuit that links two pieces of equipment so that one cannot operate unless the other is in a particular state — a safety interlock that starts a fan when a damper opens, or a control scheme that restores power automatically when a condition changes. That helpful automation becomes a hazard during maintenance: a remote signal, a timer, or another operator’s action can close a contact and feed energy back into a circuit that a worker believes is dead. A backfeed through a transformer or an alternate path can do the same. The only defence is to study the drawings, trace the interlock and backfeed paths, and confirm that no such operation can restore energy to the work area — and to update the drawings whenever the system changes so the next review is working from the truth.
5. Control Devices Are Not Isolating Devices
Control devices — push-buttons, selector switches, and similar devices — must never be used as the primary isolating device. Locks and tags go only on circuit disconnecting means.
The distinction is physical, not bureaucratic. A control device tells equipment what to do; it does not break the conductors that carry energy to the equipment. Pressing stop, or turning a selector to “off,” leaves the circuit energized behind the control — and a fault, a shorted contact, or an accidental restart can put that energy straight back into the machine. A lock on a start button therefore locks nothing that matters. Some control devices are fitted with a hasp or a locking feature, and fitting a lock to one is not itself forbidden — but an identified lockout/tagout device must not be used there as if it were the lockout point. The lock belongs on the disconnecting means, the device that actually opens the circuit. If a device does not create a break in the conductors supplying the equipment, it is not a lockout point.
6. Identification — A Lockout Device Must Be Unmistakable
A lockout/tagout device must be unique and readily identifiable as a lockout/tagout device. That means durable, substantial, and standardized — recognizable at a glance by its colour, shape, or size, with tag print and format standardized as well.
The reason is confusion, and confusion kills. A plant is full of locks and tags used for other purposes: process-control locks, information tags, equipment tags, padlocks on gates and cabinets. If a lockout lock looks like any of them, someone can remove it, ignore it, or mistake an ordinary padlock for a lockout lock and assume a circuit is safe when it is not. Standardization removes that ambiguity: every worker on site should be able to look at a device and know instantly that it means “do not operate — a person is protected by this.” No lockout device may double as anything else.
7. Coordination — One Site, One Understanding
Coordination ties the lockout procedure to everything around it, in three directions. First, the electrical lockout/tagout procedure must be coordinated with every other employer’s procedures for controlling exposure to electrical energy sources, so that all employers’ requirements are adequately addressed on a site basis. On a multi-employer job, each employer brings its own procedure; without coordination, one employer’s lockout can conflict with another’s, or leave a gap neither covers. Employers must exchange information, amend procedures where needed, and make sure every worker understands the conditions that matter to the other employers.
Second, the procedure for controlling electrical hazards must be coordinated with other procedures for controlling other hazardous energy — pneumatic, hydraulic, thermal, mechanical, and the rest — where those procedures rest on similar or identical concepts. An electrical lockout can be integrated into an overall hazardous-energy control procedure, but only if that combined procedure still addresses every issue the electrical standard requires.
Third, electrical lockout/tagout devices are permitted to be similar to the devices used for other hazardous energy sources — the same style of lock or tag for a steam valve as for a disconnect — provided those devices are used only for controlling hazardous energy and for no other purpose. Similarity helps recognition; exclusivity preserves meaning.
Worked Scenario
A food-processing plant is shutting down a packaging line for a motor replacement. The crew includes the plant’s own electrician, a millwright from a contractor who will change the motor coupling, and a production worker who will clean the line while it is down.
The electrician starts with the drawings and finds two supplies: the normal 480-volt feeder and a second feed through a transfer switch that serves the line during peak hours — a source the old procedure did not mention. She also traces an interlock: a level sensor in the upstream hopper can restart the conveyor automatically when product is present, which would re-energize the motor circuit through a control relay. Both findings change the plan.
Every person who could be exposed is brought into the lockout: the electrician (direct), the millwright (indirect — his hands are on the coupling), the cleaner (indirect — inside the guarded line), and the contractor’s supervisor, whose own company’s lockout procedure is reviewed and coordinated with the plant’s so both sets of requirements are met on site. The lock goes on the 480-volt disconnecting means for each supply — not on the start/stop push-button station, which the millwright had suggested as “easier.” The locks are the plant’s standardized red lockout locks, distinct from the blue process locks used elsewhere in the facility, and each carries a tag naming its installer. The steam supply to a nearby heat tunnel is locked out under the same coordinated plan with a matching device, used only for energy control. Only when every source is controlled, every interlock path is checked, and every exposed person is involved does the work begin.
Common Mistakes and Safety Notes
- Locking out only the electrician. The millwright on the coupling, the cleaner inside the line, and the contractor’s crew are exposed too. If they are not in the procedure, the lockout is incomplete.
- Working from a stale drawing. An undocumented feeder, tie breaker, or re-routed circuit is an energy source nobody controls. Verify the drawings match the installation before you trust them.
- Forgetting stored and mechanical energy. Capacitors hold charge, springs hold force, and a raised load holds gravity. Controlling the supply breaker is not the same as controlling all energy.
- Trusting an interlock to stay quiet. Remote signals, timers, and automatic restarts can re-energize a circuit. Trace interlock and backfeed paths on the drawings and confirm they cannot restore energy.
- Locking the push-button. A start/stop station does not open the conductors. A lock there protects nothing; the lock belongs on the disconnecting means.
- Using an ordinary padlock. If a lockout lock can be confused with a process lock or a gate padlock, it will be — sooner or later. Lockout devices must be unique, standardized, and used for nothing else.
- Skipping coordination on a multi-employer job. Two employers with two uncoordinated procedures can leave a gap in the middle. Exchange information and make one site-wide understanding before work starts.
Summary
The seven principles in 120.3 are the foundation every lockout stands on: involve everyone who could be exposed, directly or indirectly, including contractors; build the procedure from the real equipment and up-to-date drawings; control every source of energy, including stored and mechanical energy; check drawings so no interlock or backfeed can re-energize the circuit; put locks and tags only on disconnecting means, never on control devices; make every lockout device unique and instantly recognizable; and coordinate the procedure across employers and across other hazardous-energy programs. Skip any one of them and the lock on the disconnect may be doing less than the worker who fitted it believes.
Quick-Check Questions
- Who must be involved in a lockout/tagout procedure?
Answer: Every person who could be exposed directly or indirectly to a source of electrical energy, including temporary and contract employees. - What documentation must a lockout/tagout procedure be based on?
Answer: The existing electrical equipment and system, using suitable documentation including up-to-date drawings and diagrams. - Why must drawings be reviewed for interlocks before work begins?
Answer: To ensure no electrical circuit interlock operation — or backfeed — can re-energize the circuit being worked on. - Why can a push-button or selector switch never be the primary isolating device?
Answer: It does not create a break in the conductors supplying the equipment, so the circuit remains energized behind it. - What does it mean for a lockout/tagout device to be unique and readily identifiable?
Answer: It is standardized in colour, shape, size, print, and format so workers recognize it instantly and cannot confuse it with locks or tags used for other purposes.
Based on NFPA 70E (2024), Article 120, paraphrased for study.